State | |
---|---|
River name | Parana |
sub-basin name | Acaray |
Company name | Administración Nacional de Electricidad (ANDE). |
Latitude | |
Longitude | |
Construction Period | 1972 |
Total installed power(MW) | 256 |
Destination of Energy | |
Historical Maximum discharge(m3/s) | |
Mean discharge (m3/s) | |
Historical minimum discharge (m3/s) | |
Basin area (km2) | |
maximum operational water level (m) | |
extreme maximum water level (m) | |
operational water level (m) | |
minimum operational water level (m) | |
Total volume (m3) | |
Net volume (m3) | |
Length (km) | |
Surface area at normal condition (km2) | |
Downstream water level(maximum) (m) | |
Downstream water level(normal) (m) | |
Downstream water level(minimum) (m) | |
Height of the spillway outlet (m) | |
Height of the main dam (m) | 41 |
Length of the main dam(m) | |
Vaciemiento máximo / Capacidad de descarge del vertedor (m3/s) | |
Tipo | |
Número de Compuertas Total | |
superfície | |
Base | |
Largo (m) | |
Altura (m) | |
Cota del tipo de ogiva | |
Longitud de la cresta (m) | |
Número de unidades instaladas | |
Potencial nominal (MW) | |
Tipo | |
Ancho Total (m) | |
Largo Total (m) | |
Desnível (m) | |
Referencia | |
Otro información |