Graminha (Caçonde)

State Caconde-SP
River name Grande
sub-basin name Pardo
Company name AES Tietê S.A.
Latitude 21°34'37"S
Longitude 46°37'28"W
Construction Period 1966
Total installed power(MW) 80
Destination of Energy PIE
Historical Maximum discharge(m3/s)
Mean discharge (m3/s)
Historical minimum discharge (m3/s)
Basin area (km2)
maximum operational water level (m) 855.00
extreme maximum water level (m)
operational water level (m)
minimum operational water level (m) 825.5
Total volume (m3)
Net volume (m3) 540,000,000
Length (km)
Surface area at normal condition (km2) 31
Downstream water level(maximum) (m)
Downstream water level(normal) (m)
Downstream water level(minimum) (m)
Height of the spillway outlet (m)
Height of the main dam (m) 60
Length of the main dam(m) 450.00
Vaciemiento máximo / Capacidad de descarge del vertedor (m3/s)
Tipo
Número de Compuertas Total 2
superfície
Base
Largo (m)
Altura (m) 105
Cota del tipo de ogiva
Longitud de la cresta (m)
Número de unidades instaladas 2
Potencial nominal (MW) 41.2, 39.2
Tipo Francis
Ancho Total (m)
Largo Total (m)
Desnível (m)
Referencia
Otro información
Graminha (Caçonde)