Chavantes

State Ribeirao Clãro-PR/ Chavantes-SP
River name Paraná
sub-basin name Paranapanema
Company name DEIGP S/A
Latitude 23°7'36"S  
Longitude 49°43'53"W
Construction Period 1959-1971
Total installed power(MW) 414
Destination of Energy PIE
Historical Maximum discharge(m3/s) 397,200
Mean discharge (m3/s) 30600or 31000
Historical minimum discharge (m3/s) 8,500
Basin area (km2)
maximum operational water level (m)
extreme maximum water level (m)
operational water level (m) 474
minimum operational water level (m)
Total volume (m3) 8800000000
Net volume (m3)
Length (km)
Surface area at normal condition (km2) 400
Downstream water level(maximum) (m) 403.50
Downstream water level(normal) (m) 398.67
Downstream water level(minimum) (m) 397.22
Height of the spillway outlet (m)
Height of the main dam (m) 98
Length of the main dam(m)
Vaciemiento máximo / Capacidad de descarge del vertedor (m3/s)
Tipo
Número de Compuertas Total 3
superfície
Base
Largo (m) 14
Altura (m) 15.32
Cota del tipo de ogiva
Longitud de la cresta (m) 48
Número de unidades instaladas
Potencial nominal (MW) 105.980kw
Tipo Francis
Ancho Total (m)
Largo Total (m)
Desnível (m)
Referencia www.duke-energy.com.br/PT/Usinas/uhe_chavantes.asp?id=1...
Otro información
Chavantes
TOP