State | Guaíra-SP/ Planura-MG |
---|---|
River name | Paraná |
sub-basin name | Grande |
Company name | FURNAS |
Latitude | 20°7'45"S |
Longitude | 48°34'17"W |
Construction Period | 1970-1973 |
Total installed power(MW) | 320 |
Destination of Energy | SP |
Historical Maximum discharge(m3/s) | |
Mean discharge (m3/s) | |
Historical minimum discharge (m3/s) | |
Basin area (km2) | |
maximum operational water level (m) | 467.2 |
extreme maximum water level (m) | |
operational water level (m) | 467.2 |
minimum operational water level (m) | 465.5 |
Total volume (m3) | 1,525 bilhões |
Net volume (m3) | 2,335 bilhões |
Length (km) | |
Surface area at normal condition (km2) | 143 |
Downstream water level(maximum) (m) | |
Downstream water level(normal) (m) | |
Downstream water level(minimum) (m) | |
Height of the spillway outlet (m) | |
Height of the main dam (m) | 40 |
Length of the main dam(m) | |
Vaciemiento máximo / Capacidad de descarge del vertedor (m3/s) | 16000 |
Tipo | segmento |
Número de Compuertas Total | 9 |
superfície | |
Base | |
Largo (m) | 15 |
Altura (m) | 15.4 |
Cota del tipo de ogiva | |
Longitud de la cresta (m) | |
Número de unidades instaladas | 4 |
Potencial nominal (MW) | 80 |
Tipo | Kaplan |
Ancho Total (m) | |
Largo Total (m) | |
Desnível (m) | |
Referencia | http://www.mundociencia.com.br/fisica/eletricidade/pcolombia.htm |
Otro información | T/G supplier: Nohab, ASEA It cost about $63mn (without IDC) and was financially supported by the World Bank. |